Road tunnel

Al-Uruba Road Tunnel

A 2,150 m east-west tunnel crossing the Abu Bakr Al-Siddiq tunnel

Completedas of Jul 2024 📍 See on the map

Completed 25 Jul 2024. The Foundation page gives the eastern-route opening date only as a placeholder (x/7/2024), so we do not state a day. The Arabic name is from a search summary and is medium confidence.

The Al-Uruba tunnel lies in the north of the park and crosses Abu Bakr Al-Siddiq Road. It is 2,150 m long with three lanes and an emergency lane each way and five emergency exits. The Foundation announced completion on 25 July 2024. Its stated peak capacity of 140,000 vehicles per hour looks implausible and is flagged, not corrected.

Key facts

Length 2,150 m King Salman Park Founda…Jul 2024King Salman Park Founda…Jul 2024 Foundation announcement, July 2024 · as of Jul 2024
Stated peak capacity 140,000 vehicles per hour King Salman Park Founda…Jul 2024 As printed by the Foundation; likely a per-day or typographical error, flagged and not corrected · as of Jul 2024
Low confidence

Sources

  1. OSM way 245588772 Al Uaroba Road (© OpenStreetMap contributors, ODbL) · OpenStreetMap contributors, 12 Nov 2026
  2. (Arabic version) The Opening of Al-Orouba Tunnel · King Salman Park Foundation, 25 Jul 2024
  3. Al-Orouba Tunnel · King Salman Park Foundation, 25 Jul 2024

The monthly King Salman Park briefing

What opened, what was awarded, what changed. One email a month, sourced.

Suggest a correction

We welcome corrections from the project team, journalists and readers. Please include a source link if you can.