Everything planned

Explore King Salman Park

Every announced attraction, building and district, with its status and sources. Filter by category or status to find what matters to you.

Where everything stands today

12 announced places by status. Select a status to filter the list. as of 12 Nov 2026

  • Announced8
  • Planned14
  • In design1
  • Under construction31
  • Completed6
  • Being replanned1

Nothing is open to the public yet. Each status comes from dated sources on the place's own page.

Category
Status
District

12 of 12 places

Infrastructure

12
Terraced pools and planting in morning mist. Artist impression, not an official rendering
Water treatment plant

Water Treatment Complex

The plant that turns wastewater into the park's irrigation

Under constructionas of Sep 2026
Car park

Underground parking (Grand Mosque package)

29,408 m² of parking for 705 cars

Under constructionas of Dec 2025
Parking and access hubs

Parking hubs and gateway hubs

Large hub buildings on the Loop that keep cars at the park's edge

Under constructionas of Jan 2026
Bridges

Loop and Boulevard bridges

Six bridges in Phase 2: four on the Loop and two on the Boulevard

Under constructionas of Jan 2026 Phase 2
Footbridge

Skyline Loop Bridge

Skeletal Corten-steel bridges over the widest wadi

Under constructionas of Jan 2026
District cooling plant

District Cooling Plant

Chilled water for the park's buildings instead of hundreds of air conditioners

Under constructionas of Jun 2023
Electrical infrastructure

Power supply (five power stations)

Five power stations totalling 580 MW

Plannedas of Jan 2022
Landscape engineering

Retaining (MSE) walls

17 km of stone-clad walls that sculpt the park's wadis and hills

Completedas of May 2026
Infrastructure package

Phase 1 site-wide infrastructure

Roads, storm drains, irrigation, power and data for the first phase

Under constructionas of Oct 2026 Phase 1
Infrastructure package

Phase 2 infrastructure

Six bridges and the networks for the eastern phase

Under constructionas of Nov 2025 Phase 2
Irrigation infrastructure

Irrigation network

Subsurface irrigation fed entirely by treated effluent

Completedas of Sep 2026
Digital infrastructure

Smart park platform

Sensors, a digital twin and a visitor 'Super App'

In designas of Jan 2026

The monthly King Salman Park briefing

What opened, what was awarded, what changed. One email a month, sourced.

Suggest a correction

We welcome corrections from the project team, journalists and readers. Please include a source link if you can.